Drainage of polluted sites and soils

The rehabilitation of former industrial sites regularly appear the problem of building on contaminated sites. Containment is based on the implementation of a drainage geocomposite, the SOMTUBE GAZ, for creating a preferential path and avoid any gas accumulation on the underside of the geomembrane under the building.

 

The SOMTUBE GAZ consists of:

- A non-woven filter web needled,

- From mini-drains ringed regularly perforated,

- A non-woven drainage layer needled.

 

It has two decisive Advantages:

 

- Fast and economical technical solution,

- Design by an authorized design office.

Formulaire demande

Formulaire demande

Inscrivez-vous

CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.